Today was a pretty good day for the XLH900: Rear fender is ready (sissybar under construction), Seathinge is installed with a temporary Biltwell seatpan. (Duane Ballard is doing the leatherwork right now). I have some Biltwell bars with Biltwell Kung Fu grips for now till I have a longer clutchcable to install the Frisco bars. Waiting for the frontaxle which is being reduced from 3/4" to 5/8" so it will fit the 21 inch Mini Brake wheel.
Next up is installing the Frontwheel and tank so I'm almost ready for the first testride....
No comments:
Post a Comment